




HARRISON – Hello soccer fans! Below are photos of workers on the Red Bull Arena site getting infrastructure ready for precast concrete. Right now three cranes are operating along with a JLG lift. The workers are doing the "boom up and connect" aspect of their work that puts the structural steel in place and either welding or riveting the assemblies together. Let's give a big cheer for a 2009 opening date.